What is required to safely use fabricated frame scaffolds?
General Requirements The structural members of fabricated frame scaffolds such as the legs, poles, posts, frames and uprights shall be plumb and braced to prevent swaying and displacement. Horizontally at end, at intervals not to exceed 30 feet from one end.
What are the requirements for working on a moving scaffold?
When moving a rolling scaffold, meet specific standards so as to not cause injury or accident. Apply manual force as close to the base as possible but not more than five feet above the supporting surface. Stabilize rolling scaffolds before movement to prevent tipping.
What are five requirements for scaffolding?
safe working load / load class. maximum leg loads. maximum tie spacing both horizontal and vertical and tie duty. details of additional elements such as beamed bridges, fans, loading bays etc, which may be a standard configuration (see note 1 ref TG20:13) or specifically designed.
How often do scaffolds and scaffold components have to be inspected for visual defects?
scaffolds and scaffold components shall be inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold’s structural integrity.” You ask two questions regarding the competent person requirement.
Do you need a certificate to erect scaffolding?
Q. What qualifications do I need to put up scaffolding? Scaffolds should be designed, erected, altered and dismantled only by competent people and the work should always be carried out under the direction of a competent supervisor. This is a requirement of the Work at Height Regulations 2005.
What are the procedures for dismantling trestle scaffolding?
Follow these steps to dismantle a trestle scaffold: Step 1: The first thing that you need to take care of is safety. Step 2: Start the process from the top of the scaffold. Step 3: If the guardrails and toe boards were mounted, remove them first. Step 4: Hand over the dismantled part to the person at a lower point.
What is the first thing to be done before erecting a scaffold?
Create a Field Level Risk Assessment (FLRA) Process of erection, which can minimize the hazards associated with the overall process. Bracing plan. Material Handling procedures. Power lines.